You don't have javascript enabled. Good luck with that.
Pencarian
Sudin Bina Marga Perbaiki Railing JPO di Kali Keronconv

Eight Railings of JPO in Keroncong Menteng River Improved

Three damaged railings are welded. All railings will be painted, so it can look more beautiful

Central Jakarta Bina Marga Sub-dept. is repairing eight railings of the pedestrian bridge (JPO) in the Keroncong River flows, in Menteng Sub-district. It is targeted can be completed in the upcoming November.

"There are totally nine bridges along Keroncong River, Menteng. But we just need to repair eight with total length of the bridge is 222,40 meters," expressed Sukowibowo, Head of Central Jakarta Bina Marga Sub-dept., Monday (9/25).

Billboards in Three Crossing Bridges will Be Controlled

Of eight bridges, five out of them have no railing thus new railing must be made.

"Three damaged railings are welded. All railings will be painted, so it can look more beautiful," he stated.

Linked News
Popular News indeks
  1. Jakarta Government Guarantees Full Medical Care for Bantargebang Landslide Victims

    access_time09-03-2026 remove_red_eye1298 personDessy Suciati
  2. Commission E Supports Restricting Children's Access to Social Media

    access_time09-03-2026 remove_red_eye1130 personFakhrizal Fakhri
  3. Affordable and High-Quality Staple Goods Offered at Ramadan Bazaar

    access_time09-03-2026 remove_red_eye840 personAldi Geri Lumban Tobing
  4. Jakarta Planetarium Rolls Out Varied Shows for Eid al-Fitr Holiday

    access_time11-03-2026 remove_red_eye295 personAldi Geri Lumban Tobing
  5. Travelers Departing from Lebak Bulus Terminal Starting to Increase

    access_time13-03-2026 remove_red_eye276 personTiyo Surya Sakti