You don't have javascript enabled. Good luck with that.
Pencarian
Sudin Bina Marga Perbaiki Railing JPO di Kali Keronconv
.
photo Wuri Setyaningsih - Beritajakarta.id

Eight Railings of JPO in Keroncong Menteng River Improved

Three damaged railings are welded. All railings will be painted, so it can look more beautiful

Central Jakarta Bina Marga Sub-dept. is repairing eight railings of the pedestrian bridge (JPO) in the Keroncong River flows, in Menteng Sub-district. It is targeted can be completed in the upcoming November.

"There are totally nine bridges along Keroncong River, Menteng. But we just need to repair eight with total length of the bridge is 222,40 meters," expressed Sukowibowo, Head of Central Jakarta Bina Marga Sub-dept., Monday (9/25).

Billboards in Three Crossing Bridges will Be Controlled

Of eight bridges, five out of them have no railing thus new railing must be made.

"Three damaged railings are welded. All railings will be painted, so it can look more beautiful," he stated.

Linked News
Popular News indeks
  1. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye357 personTiyo Surya Sakti
  2. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye329 personAldi Geri Lumban Tobing
  3. MRT Jakarta Considers Route Expansion to South Tangerang

    access_time13-07-2025 remove_red_eye319 personAldi Geri Lumban Tobing
  4. Smoke-Free Neighborhoods Could Be a Pilot Project for the KTR Regional Regulation Implementation

    access_time18-07-2025 remove_red_eye251 personFakhrizal Fakhri
  5. Council Encourages the Increase of RPTRAs for Child Growth and Development

    access_time18-07-2025 remove_red_eye250 personFakhrizal Fakhri

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik